The Resource Building a project work breakdown structure : visualizing objectives, deliverables, activities, and schedules, Dennis P. Miller, (electronic resource)

Building a project work breakdown structure : visualizing objectives, deliverables, activities, and schedules, Dennis P. Miller, (electronic resource)

Label
Building a project work breakdown structure : visualizing objectives, deliverables, activities, and schedules
Title
Building a project work breakdown structure
Title remainder
visualizing objectives, deliverables, activities, and schedules
Statement of responsibility
Dennis P. Miller
Creator
Contributor
Subject
Genre
Language
eng
Additional physical form
Also available in print.
Cataloging source
CaONFJC
http://library.link/vocab/creatorName
Miller, Dennis P
Dewey number
658.4/04
Illustrations
illustrations
Index
index present
LC call number
HD69.P75
LC item number
M536 2009eb
Literary form
non fiction
Nature of contents
  • dictionaries
  • bibliography
http://library.link/vocab/relatedWorkOrContributorName
MyiLibrary
Series statement
ESI international project management series
http://library.link/vocab/subjectName
  • Project management
  • Work breakdown structure
Label
Building a project work breakdown structure : visualizing objectives, deliverables, activities, and schedules, Dennis P. Miller, (electronic resource)
Link
Instantiates
Publication
Note
"An Auerbach book."
Bibliography note
Includes bibliographical references and index
Dimensions
24 cm.
Dimensions
unknown
Extent
xxxv, 226 p.
Form of item
electronic
Isbn
9786611515683
Other control number
9786611515683
Other physical details
ill.
Reproduction note
Electronic reproduction.
Specific material designation
remote
Stock number
151568
System control number
  • (CaMWU)u2076166-01umb_inst
  • cis8823934
  • (OCoLC)276171958
Label
Building a project work breakdown structure : visualizing objectives, deliverables, activities, and schedules, Dennis P. Miller, (electronic resource)
Link
Publication
Note
"An Auerbach book."
Bibliography note
Includes bibliographical references and index
Dimensions
24 cm.
Dimensions
unknown
Extent
xxxv, 226 p.
Form of item
electronic
Isbn
9786611515683
Other control number
9786611515683
Other physical details
ill.
Reproduction note
Electronic reproduction.
Specific material designation
remote
Stock number
151568
System control number
  • (CaMWU)u2076166-01umb_inst
  • cis8823934
  • (OCoLC)276171958

Library Locations

  • Albert D. Cohen Management LibraryBorrow it
    181 Freedman Crescent, Winnipeg, MB, R3T 5V4, CA
    49.807878 -97.129961
  • Architecture/Fine Arts LibraryBorrow it
    84 Curry Place, Winnipeg, MB, CA
    49.807716 -97.136226
  • Archives and Special CollectionsBorrow it
    25 Chancellors Circle (Elizabeth Dafoe Library), Room 330, Winnipeg, MB, R3T 2N2, CA
    49.809961 -97.131878
  • Bibliothèque Alfred-Monnin (Université de Saint-Boniface)Borrow it
    200, avenue de la Cathédrale, Local 2110, Winnipeg, MB, R2H 0H7, CA
    49.888861 -97.119735
  • Bill Larson Library (Grace Hospital)Borrow it
    300 Booth Drive, G-227, Winnipeg, MB, R3J 3M7, CA
    49.882400 -97.276436
  • Carolyn Sifton - Helene Fuld Library (St. Boniface General Hospital)Borrow it
    409 Tache Avenue, Winnipeg, MB, R2H 2A6, CA
    49.883388 -97.126050
  • Concordia Hospital LibraryBorrow it
    1095 Concordia Avenue, Winnipeg, MB, R2K 3S8, CA
    49.913252 -97.064683
  • Donald W. Craik Engineering LibraryBorrow it
    75B Chancellors Circle (Engineering Building E3), Room 361, Winnipeg, MB, R3T 2N2, CA
    49.809053 -97.133292
  • E.K. Williams Law LibraryBorrow it
    224 Dysart Road, Winnipeg, MB, R3T 5V4, CA
    49.811829 -97.131017
  • Eckhardt-Gramatté Music LibraryBorrow it
    136 Dafoe Road (Taché Arts Complex), Room 257, Winnipeg, MB, R3T 2N2, CA
    49.807964 -97.132222
  • Elizabeth Dafoe LibraryBorrow it
    25 Chancellors Circle, Winnipeg, MB, R3T 2N2, CA
    49.809961 -97.131878
  • Fr. H. Drake Library (St. Paul's College)Borrow it
    70 Dysart Road, Winnipeg, MB, R3T 2M6, CA
    49.810605 -97.138184
  • J.W. Crane Memorial Library (Deer Lodge Centre)Borrow it
    2109 Portage Avenue, Winnipeg, MB, R3J 0L3, CA
    49.878000 -97.235520
  • Libraries Annex (not open to the public; please see web page for details)Borrow it
    25 Chancellors Circle (in the Elizabeth Dafoe Library), Winnipeg, MB, R3T 2N2, CA
    49.809961 -97.131878
  • Neil John Maclean Health Sciences LibraryBorrow it
    727 McDermot Avenue (Brodie Centre), 200 Level, Winnipeg, MB, R3E 3P5, CA
    49.903563 -97.160554
  • Sciences and Technology LibraryBorrow it
    186 Dysart Road, Winnipeg, MB, R3T 2M8, CA
    49.811526 -97.133257
  • Seven Oaks General Hospital LibraryBorrow it
    2300 McPhillips Street, Winnipeg, MB, R2V 3M3, CA
    49.955177 -97.148865
  • Sister St. Odilon Library (Misericordia Health Centre)Borrow it
    99 Cornish Avenue, Winnipeg, MB, R3C 1A2, CA
    49.879592 -97.160425
  • St. John's College LibraryBorrow it
    92 Dysart Road, Winnipeg, MB, R3T 2M5, CA
    49.811242 -97.137156
  • Victoria General Hospital LibraryBorrow it
    2340 Pembina Highway, Winnipeg, MB, R3T 2E8, CA
    49.806755 -97.152739
  • William R Newman Library (Agriculture)Borrow it
    66 Dafoe Road, Winnipeg, MB, R3T 2R3, CA
    49.806936 -97.135525
Processing Feedback ...