The Resource Case analysis : the critical path to persuasion, John Hollander

Case analysis : the critical path to persuasion, John Hollander

Label
Case analysis : the critical path to persuasion
Title
Case analysis
Title remainder
the critical path to persuasion
Statement of responsibility
John Hollander
Creator
Contributor
Author
Distributor
Subject
Genre
Language
eng
Member of
Additional physical form
Also available in print version.
Cataloging source
CaOTU
http://library.link/vocab/creatorDate
1951-
http://library.link/vocab/creatorName
Hollander, John
Dewey number
343.71/072
Index
index present
LC call number
KE8402
LC item number
.H64 2014eb
Literary form
non fiction
Nature of contents
dictionaries
http://library.link/vocab/relatedWorkOrContributorName
Canadian Electronic Library (Firm)
Series statement
Young advocates series
http://library.link/vocab/subjectName
  • Trial practice
  • Civil procedure
  • Persuasion (Rhetoric)
Label
Case analysis : the critical path to persuasion, John Hollander
Link
http://www.deslibris.ca/ID/448684
Instantiates
Publication
Distribution
Note
  • Includes index
  • Issued as part of the desLibris books collection
Antecedent source
file reproduced from original
Carrier category
  • volume
  • online resource
Carrier category code
  • nc
Carrier MARC source
  • rdacarrier
  • rdacarrier
Color
multicolored
Content category
text
Content type MARC source
rdacontent
Contents
How case analysis works in civil litigation -- Case analysis : what is it? -- Mechanics -- Applications -- Case scenario
Dimensions
unknown
Extent
1 electronic text (xiii, 195 pages).
Form of item
online
Governing access note
Access restricted to authorized users and institutions
Isbn
9781552213674
Media category
  • unmediated
  • electronic
Media MARC source
  • isbdmedia
  • isbdmedia
Media type code
  • n
Publisher number
448684
Specific material designation
remote
System control number
  • (CaBNVSL)slc00235050
  • (OCoLC)893231897
  • (CaOOCEL)448684
System details
Mode of access: World Wide Web
Label
Case analysis : the critical path to persuasion, John Hollander
Link
http://www.deslibris.ca/ID/448684
Publication
Distribution
Note
  • Includes index
  • Issued as part of the desLibris books collection
Antecedent source
file reproduced from original
Carrier category
  • volume
  • online resource
Carrier category code
  • nc
Carrier MARC source
  • rdacarrier
  • rdacarrier
Color
multicolored
Content category
text
Content type MARC source
rdacontent
Contents
How case analysis works in civil litigation -- Case analysis : what is it? -- Mechanics -- Applications -- Case scenario
Dimensions
unknown
Extent
1 electronic text (xiii, 195 pages).
Form of item
online
Governing access note
Access restricted to authorized users and institutions
Isbn
9781552213674
Media category
  • unmediated
  • electronic
Media MARC source
  • isbdmedia
  • isbdmedia
Media type code
  • n
Publisher number
448684
Specific material designation
remote
System control number
  • (CaBNVSL)slc00235050
  • (OCoLC)893231897
  • (CaOOCEL)448684
System details
Mode of access: World Wide Web

Library Locations

  • Albert D. Cohen Management LibraryBorrow it
    181 Freedman Crescent, Winnipeg, MB, R3T 5V4, CA
    49.807878 -97.129961
  • Architecture/Fine Arts LibraryBorrow it
    84 Curry Place, Winnipeg, MB, CA
    49.807716 -97.136226
  • Archives and Special CollectionsBorrow it
    25 Chancellors Circle (Elizabeth Dafoe Library), Room 330, Winnipeg, MB, R3T 2N2, CA
    49.809961 -97.131878
  • Bibliothèque Alfred-Monnin (Université de Saint-Boniface)Borrow it
    200, avenue de la Cathédrale, Local 2110, Winnipeg, MB, R2H 0H7, CA
    49.888861 -97.119735
  • Bill Larson Library (Grace Hospital)Borrow it
    300 Booth Drive, G-227, Winnipeg, MB, R3J 3M7, CA
    49.882400 -97.276436
  • Carolyn Sifton - Helene Fuld Library (St. Boniface General Hospital)Borrow it
    409 Tache Avenue, Winnipeg, MB, R2H 2A6, CA
    49.883388 -97.126050
  • Concordia Hospital LibraryBorrow it
    1095 Concordia Avenue, Winnipeg, MB, R2K 3S8, CA
    49.913252 -97.064683
  • Donald W. Craik Engineering LibraryBorrow it
    75B Chancellors Circle (Engineering Building E3), Room 361, Winnipeg, MB, R3T 2N2, CA
    49.809053 -97.133292
  • E.K. Williams Law LibraryBorrow it
    224 Dysart Road, Winnipeg, MB, R3T 5V4, CA
    49.811829 -97.131017
  • Eckhardt-Gramatté Music LibraryBorrow it
    136 Dafoe Road (Taché Arts Complex), Room 257, Winnipeg, MB, R3T 2N2, CA
    49.807964 -97.132222
  • Elizabeth Dafoe LibraryBorrow it
    25 Chancellors Circle, Winnipeg, MB, R3T 2N2, CA
    49.809961 -97.131878
  • Fr. H. Drake Library (St. Paul's College)Borrow it
    70 Dysart Road, Winnipeg, MB, R3T 2M6, CA
    49.810605 -97.138184
  • J.W. Crane Memorial Library (Deer Lodge Centre)Borrow it
    2109 Portage Avenue, Winnipeg, MB, R3J 0L3, CA
    49.878000 -97.235520
  • Libraries Annex (not open to the public; please see web page for details)Borrow it
    25 Chancellors Circle (in the Elizabeth Dafoe Library), Winnipeg, MB, R3T 2N2, CA
    49.809961 -97.131878
  • Neil John Maclean Health Sciences LibraryBorrow it
    727 McDermot Avenue (Brodie Centre), 200 Level, Winnipeg, MB, R3E 3P5, CA
    49.903563 -97.160554
  • Sciences and Technology LibraryBorrow it
    186 Dysart Road, Winnipeg, MB, R3T 2M8, CA
    49.811526 -97.133257
  • Seven Oaks General Hospital LibraryBorrow it
    2300 McPhillips Street, Winnipeg, MB, R2V 3M3, CA
    49.955177 -97.148865
  • Sister St. Odilon Library (Misericordia Health Centre)Borrow it
    99 Cornish Avenue, Winnipeg, MB, R3C 1A2, CA
    49.879592 -97.160425
  • St. John's College LibraryBorrow it
    92 Dysart Road, Winnipeg, MB, R3T 2M5, CA
    49.811242 -97.137156
  • Victoria General Hospital LibraryBorrow it
    2340 Pembina Highway, Winnipeg, MB, R3T 2E8, CA
    49.806755 -97.152739
  • William R Newman Library (Agriculture)Borrow it
    66 Dafoe Road, Winnipeg, MB, R3T 2R3, CA
    49.806936 -97.135525
Processing Feedback ...